Yep, Phase 3 is expected to be released on the 6th of April 2018 or earlier. I've just finished my exams so I'll have much more time to work on the remaining buildings, I hope everything can be finished by then
To answer the 3 questions:
The InterCity railway will not be functional unfortunately, it only exists as a station.
Bus stops have already been added, albeit not enough for a network to be developed.
An impression of the network is shown below, but since it will be a rather long time before the stadium and harbour are finished, I can't really create a network.
Ahh the discussion group, the idea has been scrapped since I'm basically posting everything on Twitter right now XDD.
The newest version of the MCR Network Map is shown below. It's now more user-friendly.
It's great that you're looking forward to Phase 3, I'm sure it will please! New pictures of Phase 3 will come out as work is being done quicker now. Stay tuned!
NXUS
Thanks for the reply!
Oooh nice! I love the impression map!
I guess the Stadium Station will be part of the Exhibition Line (will be built in the distant future)? I wonder what it'll look like if you combine both the MCR and Bus Networks into one System Map (for fun, just an idea)!
I understand that the whole bus network will not be complete until further in the future, however, will at least one line (eg. Line 2 (with completed roads)) or a portion of the other lines be operational by The Hub Update?
Oooh nice! I love the impression map!
I guess the Stadium Station will be part of the Exhibition Line (will be built in the distant future)? I wonder what it'll look like if you combine both the MCR and Bus Networks into one System Map (for fun, just an idea)!
I understand that the whole bus network will not be complete until further in the future, however, will at least one line (eg. Line 2 (with completed roads)) or a portion of the other lines be operational by The Hub Update?
Yeah, the Stadium Station will be on the Exhibition Line, and only the stops on Line 2 have already been done (with the exception of The Hub, where a bus interchange is yet to be developed).
Hey guys, the wait for Phase 3 of the North Extension Update (now because of the directional changes made in Update 1.1 of MCBE) is finally over! The Hub Update is the biggest project done for the NXUS MAS to date, featuring many new design styles and never-before-seen architecture. With many highlights including The Hub, Citygate Mall, the IAMN HQ, a fire station, and a busport, the update will definitely not disappoint!
Thanks for the reply!
Oooh nice! I love the impression map!
I guess the Stadium Station will be part of the Exhibition Line (will be built in the distant future)? I wonder what it'll look like if you combine both the MCR and Bus Networks into one System Map (for fun, just an idea)!
I understand that the whole bus network will not be complete until further in the future, however, will at least one line (eg. Line 2 (with completed roads)) or a portion of the other lines be operational by The Hub Update?
Yeah, the Stadium Station will be on the Exhibition Line, and only the stops on Line 2 have already been done (with the exception of The Hub, where a bus interchange is yet to be developed).
Hey guys, the wait for Phase 3 of the North Extension Update (now because of the directional changes made in Update 1.1 of MCBE) is finally over! The Hub Update is the biggest project done for the NXUS MAS to date, featuring many new design styles and never-before-seen architecture. With many highlights including The Hub, Citygate Mall, the IAMN HQ, a fire station, and a busport, the update will definitely not disappoint!
Download it here by clicking this link!
I would like to thank the IAMN members for their contributions, and for making this update possible.
I hope you guys would enjoy this city as much as I did making it!
Selfie @The IAMN Headquarters' Canteen.
Sorry, I forgot to introduce myself. Hi! Im Aira (formerly known as Artistica).