Does anyone know what circuit will delay one side then flip flop delay to other side when returning
building rail system I have to push blocks out then push rails out which I have set, but my next move is to move rails in then pull blocks when lever is flipped other way so the tracks dont break.
Basically when you power the ABBA switch, A will become powered, then B. When you unpower the switch, B will get unpowered first, then A. Looking at your description, I guess this is what you need
building rail system I have to push blocks out then push rails out which I have set, but my next move is to move rails in then pull blocks when lever is flipped other way so the tracks dont break.
any help would be greatly appreciated and rep'd
So in this video, i would replace button with switch and would stay on untill I deactivated?
Perfect thanks again!